railway_modelling:iga_line [2023/10/27 10:02] dmmediarailway_modelling:iga_line [2023/10/29 19:53] (current) – [27.10.2023] dmmedia
Line 64: Line 64:
  
   * Purchase Toyota Crown model   * Purchase Toyota Crown model
-  * Purchase foamed PVC sheet +  * <del>Purchase foamed PVC sheet</del> 
-  * Purchase needed length of flex track, turnouts, needed quantity of bedded pieces +  * Purchase needed length of flex track, turnouts, <del>needed quantity of bedded pieces</del> 
-  * Cut foamed PVC sheet into modules endpieces and first module frame pieces+  * <del>Cut foamed PVC sheet into modules endpieces and first module frame pieces</del>
   * Build first module frame   * Build first module frame
-  * Purchase transparent sheet +  * <del>Purchase transparent sheet</del> 
-  * Cut transparent sheet for first module cover +  * <del>Cut transparent sheet for first module cover</del> 
-  * Assemble first module cover+  * <del>Assemble first module cover</del>
   * Plan next activities on building first module   * Plan next activities on building first module
   * Plan next building next modules   * Plan next building next modules
Line 159: Line 159:
  
   * Prototype ballast particle size 20-60mm with less than 5% of smaller particles, which corresponds to scale size 0.25-0.75mm for 1:80 and 0.23-0.69mm for 1:87.   * Prototype ballast particle size 20-60mm with less than 5% of smaller particles, which corresponds to scale size 0.25-0.75mm for 1:80 and 0.23-0.69mm for 1:87.
 +  * Discovered, that Tillig points are unrealistic with their plastic parts. Peco H0m gauge points look much more realistically. Switching plans from Tillig to Peco.
 +  * Maximum module dimentions including cover 1150x600mm
 +  * Discovered an idea of expansion modules to the sides of main modules with more scenery. Expansion modules could be lightweight and attach hanging to main modules without feet supports.
 +  * Discovered, that obtaining and processing wood for modules base will be easier, cheaper and more enviroment friendly, than using foam boards.
 +  * Bought most of the tools for processing wood
 +
 +==== 29.10.2023 ====
 +
 +  * Discovered, that Peco turnouts are too expensive and no available from a single store. Tillig points are most similar to Iga Line points. Tillig flex point kits are much cheaper than ready points and can be adjusted as needed. There are metallic paints that can be used to color plastic parts. Also plastic pars can be replaced with metal rail profile cut to length and bent.
railway_modelling/iga_line.1698400958.txt.gz · Last modified: 2023/10/27 10:02 by dmmedia